Seismic instrumentation at the I-40 hernando desoto bridge in Memphis, Tennessee
Publication Title
Proceedings of the Structures Congress and Exposition
Recommended Citation
Pezeshk, S., Withers, M., & Steiner, G. (2006). Seismic instrumentation at the I-40 hernando desoto bridge in Memphis, Tennessee. Proceedings of the Structures Congress and Exposition, 2006, 170. https://doi.org/10.1061/40889(201)170
COinS